Stage Two

Construction has started on stage two of Shotover Primary School.  This is being built down the east end of the site, at the end of Coronet.  All going well we are expecting to have access to the finished product by early August 2018.  Once complete this will take our capacity to 650.  We will be posting progress pics here as they come in.

An Artists Impression of the final building.  This is looking from near the Coronet habitat.

An Artists Impression of the final building.  This is looking from near the Coronet habitat.

Stage 2 | Two Habitats

This stage 2 building is the same size as our original learning building.  The building we refer to as building 'A'.  The one that houses Kimi ākau and Skippers.  The two habitats in this building will be called, Kawarau and Rees.  While it is the same size as this earlier building we have made some design changes based on our learning from our current habitats.

coloured elevations.png

Elevations

There are no great changes to the external look of the building.  The roof line on the south side is slightly different.  There is also a small change in the middle of the building between the 2 habitats.  We are very excited about this.

floor plan.png
 

Floor Plan

There are a number of floor plan drawings.  This one shows the over layout with the carpet tile colourings.  Note the addition of a third breakout space and also this wonderful new elliptical seating area.  Its going to be a wonderful space to learn in.